© 2024 Titan Electric. All rights reserved.

Privacy Policy

Project Details

Titan Electric was proud to be on the construction team for Central DuPage Hospital’s new bed tower project. With a goal of housing more patients, the space spans four floors with 204 patient rooms across 3 wings. The lower level includes 25,000 square feet of executive offices, an auditorium, and conference areas. It also includes a 7,000 square foot ambulance bay connected to the existing emergency department. We were pleased to work with Pepper Construction and RTKL Associates to sustainably deliver the project using certified LEED Silver for construction waste recycling, SMACNA interior air quality standards, and low-emitting adhesives with a focus on sourcing regional materials.

shape-img shape-img

Power Up Your Project

Ready to elevate your electrical infrastructure? Reach out to Titan Electric now and let's start crafting a custom solution that drives your success.

Contact Us